Sunday 29 July 2012

CLIENTS TESTIMONIALS

Greenweiz Projects Ltd., Onkar Singh, Vice President.

This is to certify that one no. Automatic Power Factor Control panel for our Project "The Upper Deck resort" at Lonavala was supplied and installed by M/S Neel Controls, Mumbai in November 2008 and have been operating satisfactorily since then.
The Power Factor is maintained within agreed limits as was demonstratd in MSEDCL electricity bill for November 2008 statubg that power factor was 0.99 thus extending Power Factor Incentive of 5% to The Upper Deck Resort Lonavala
We further confirm that the supply, installation and commissioning of the said APFC panel met stringent Quaity norms set by us and M/S Neel Controls completed the entire job on turnkey basis within agreed delivery time.

For more details visit :- http://neelpower.com/testimonials.html 

DS.Borude, Asst. manager maintenance.

 M/S Neel Industrial system have supplied us 350 KVAR real time power factor corrector system (RTPFCS) in year September 2008.
After installaton we are able to amintain power factor within unity. The unit is user-frindly. FRom last seven manth we donot face any problem with unit. system is quite reliable.
We also have other product link ups, voltage stabilser from NEEL, there service is also prompt.

For more details visit :- http://neelpower.com/testimonials.html